The Kenya Revenue Authority (KRA) and the Kenya Ports Authority (KPA) have rolled out a raft of reforms aimed at easing congestion at the Port of Mombasa, cutting cargo dwell time, and accelerating clearance through a more coordinated, technology-driven approach.
The measures, announced during a high-level stakeholders’ meeting in Mombasa, are expected to address long-standing inefficiencies that have contributed to delays, high logistics costs, and congestion at Kenya’s main maritime gateway.
The reforms bring together port operators, transporters, shippers, freight forwarders, ship agents and regulators under a shared framework to improve predictability and operational flow.
Speaking at the forum, KRA Commissioner-General Humphrey Wattanga said the reforms signal a strategic shift towards a more efficient and digitally enabled port ecosystem that supports trade facilitation and economic growth.
He described the Port of Mombasa as not only a national asset but also a critical regional gateway for East and Central Africa.
“Our objective is to eliminate bottlenecks, reduce cargo dwell time and build a predictable, efficient and digitally enabled clearance system that supports trade and economic growth,” Wattanga said.
As part of the immediate congestion-easing measures, stakeholders agreed that all long-stay consignments earmarked for auction or destruction will be transferred to designated Container Freight Stations.
The evacuation exercise will begin at the G-section of the port and is expected to rapidly free up yard space, easing congestion and improving operational flow.
To further streamline clearance processes, KRA will expand the Pre-Arrival Processing framework, prioritising bulk cargo, low-risk shipments and Authorised Economic Operator consignments.
The enhanced system will allow cargo to be processed before arrival at the port, significantly reducing clearance times and minimising delays.
The reforms also target inefficiencies in the handling of empty containers.
KPA has allocated a dedicated site within the port for stacking and loading empty units, while a new industry framework on empty container management will take effect from January 26, 2026.
The framework is expected to improve coordination among industry players and reduce turnaround times.
In addition, KRA plans to deploy additional personnel at Regional Electronic Cargo Tracking System (RECTS) offices and port gates to speed up cargo arming and exit processes.
A multi-vendor model for RECTS seals will also be introduced through an open expression of interest to address persistent shortages, strengthen system resilience and ensure uninterrupted cargo tracking.
KPA Managing Director Capt. William Ruto reaffirmed the authority’s commitment to implementing the agreed measures in close partnership with KRA and other stakeholders, noting that efficiency at the port is a shared responsibility.
“These reforms will unlock capacity, improve operational flow and strengthen Mombasa’s competitiveness as a regional and global port,” Ruto said, adding that KPA would dedicate the necessary infrastructure and resources to ensure successful implementation.
To reduce pressure on the port and key road corridors, KRA and KPA will also work with the Kenya Railways Corporation to deploy additional wagons on the Standard Gauge Railway.
This is expected to accelerate the transfer of cargo to the Embakasi and Naivasha Inland Container Depots, improving evacuation timelines and easing congestion at the port.
Stakeholders also agreed to increase the utilisation of Lamu Port for transhipment cargo to ease pressure on Kilindini and unlock the full potential of Kenya’s northern maritime gateway.
KPA has committed to dedicating adequate infrastructure and operational resources to support transhipment activities at Lamu.
The coordinated reforms are expected to significantly reduce cargo dwell time, improve clearance predictability and strengthen Kenya’s position as East Africa’s leading logistics and trade hub.
Got a news tip? Please send us an email at info@nairobidaily.com
